Review RFIs in minutes,
not hours.

Donnie reads your project documents and drafts grounded, cited responses, ready for your review and approval.

EARLY ACCESS · WORLDWIDE · LIMITED SPOTS
RFI #1068Windows · Open

Window W-12: which size?

Ask Donnie
  1. 01 Understand
  2. 02 Search
  3. 03 Draft
  4. 04 Review
✓ Draft ready · 3 sources cited · 1 drawing issue flagged

The problem

1–2 hours
per RFI.

Based on first-hand experience answering RFIs on live construction projects.

An RFI looks like one question. Answering it properly is five jobs.

  • 01
    Find the right drawingThe current revision, not the one on site that was superseded last month.
  • 02
    Check the specificationThe clause, and the standard it calls up.
  • 03
    Search the historyPrevious RFIs, site instructions and consultant advice on the same issue.
  • 04
    Check the commercial riskIs this already in the contract documents, or is it a variation?
  • 05
    Write a defensible answerOne that still holds up if it's questioned months later.

Your numbers

38 hours / month

That's about 12 working weeks a year spent answering RFIs, time that could go back into the project.

How Donnie works

From question to cited draft, in four steps.

01

Understand

Donnie reads the RFI and works out the element, the location and exactly what is being asked. Many RFIs contain more than one question.

No question gets missed. Each one is answered separately.
02

Search

It searches your drawings, specifications, schedules, reports and previous RFIs, using only the current revisions.

Superseded sheets are ignored, and conflicts between them are flagged.
03

Draft

It writes a clear response in your office's tone, and every statement is linked to the source it came from.

If the documents don't answer the question, Donnie says so.
04

Review

You check the draft, open any source in one click, edit, and approve. Open items are routed to the right consultant.

Nothing is issued without your approval.

See Donnie in action

Pick an RFI. Watch Donnie draft the response.

Click the numbered citations to see exactly where each statement comes from. Then approve it.

Ask Donnie 00:00
    Sample project. Steps are shortened for the demo.
    Response to RFI
    APPROVED
    Draft · awaiting your review

    Sources cited

      Donnie also noticed

      The projects, companies, people and drawings in this demo are fictional. Standards and regulations are real and are cited by name only.

      Built for trust

      An RFI response is a contract document. Donnie treats it like one.

      ✓

      Grounded in project documents

      Donnie answers from your drawings, specifications and correspondence, not from general knowledge.

      Not found: No detail for the channel drain outlet in the current hydraulic set. Needs input from the hydraulic engineer.
      ✓

      Cited sources

      Every statement links to the drawing number, revision, detail or clause behind it. One click opens the source.

      [1] A-630 Rev B, Detail 3 · [2] Spec §07 Waterproofing cl. 4.2
      ✓

      Human approval

      Donnie drafts. You decide. Nothing is issued until a qualified person has reviewed it and applied their stamp.

      APPROVED · Reviewed by the project architect

      The future

      RFIs first. Then the rest of the document load.

      ● Now

      RFIs

      Grounded, cited draft responses.

      Next

      Variations

      Check claims against the contract documents.

      Next

      Specifications

      Find conflicts and out-of-date references.

      Later

      Drawings

      Cross-check revisions, callouts and schedules.

      Later

      Defects

      Trace each defect to the requirement it breaches.

      Join the waitlist

      Be one of the first teams to use Donnie.

      We're opening a small number of early access spots for practices and contractors worldwide.

      • Help shape what Donnie does next
      • A lower price for the first teams to join
      Early access requestForm D-01

      We'll only use your details to contact you about Donnie's early access. No spam, and you can unsubscribe at any time.

      RECEIVED

      You're on the list.

      We'll be in touch when early access spots open.

      Spend your time on the project, not on searching through documents.

      Join the waitlist →